• Home
  • Products
  • Aluminium balustrade
  • Glass Railing Systems

8B Series Mill Aluminum 120" Square Base Shoe Drilled for 1/2" Glass

Short Description:


  • Place of Origin: China
  • Certification:
  • MOQ: 500
  • Package: Carton
  • Delivery Time: 15
  • Price: USD175
  • Standard Size: Customized
  • Product Detail

    Product Tags

     8B Series Mill Aluminum 120" Square Base Shoe Drilled for 1/2" Glass

    Item #: 8B10D

    图片1.png


    Product Overview

    · 30% Lighter Than Traditional B5S Series Shoe

    · Designed and Engineered for Glass Railing and Windscreen Applications

    · For Use with 1/2" (12 mm) Monolithic Tempered Glass

    · 10' and 20' Stock Lengths Available Drilled and Undrilled

    · Environmentally Friendly (Green Product)

    · Easily Cut to Length Using Your Chop Saw

    · Use Monolithic Tempered Glass

    · Glass Railing Systems Meets NBC Load Requirements When Installed in Accordance to ICC-3269


    This 
    8B Series Square Base Shoe is the same profile as our standard B5S Series, but it is 30% lighter, which means it is more price competitive, environmentally friendly, and will reduce your shipping costs. Designed to work with patented TAPER-LOC® System, 8B can be easily cut to the required length using a chop saw with a minimum 10" (254 mm) saw blade for aluminum.


  • Previous: B5L Series Mill Aluminum 120" Square Base Shoe Drilled for 1/2" to 5/8" Glass
  • Next: Алюминиевые поперечные вставки по обеим сторонам стекла, вертикально или горизонтально расположенные, при помощи которых композиция приобретает идеальный двусторонний вид.

  • Product Warning:

    Does not recommend direct powder coating of this base shoe extrusion. Powder coated cladding applied over the base shoe is the recommended method.

    All pre-drilled
     Base Shoes have a +1/8 (3 mm)/-1/16 (1.5 mm) tolerance between each hole drilled in the base. Before drilling installation holes in the concrete or steel substrate it is recommended that the installer place the base shoe into the planned final position, then mark the position of the holes to be drilled into the substrate.